Chapter 22 - Financial Implications of Early Decommissioning

James G. Hewlett

Year: 1991
Volume: Volume 12
Number: Special Issue
DOI: 10.5547/ISSN0195-6574-EJ-Vol12-NoSI-22
View Abstract

Abstract:
There are three generalized timing possibilities for decommissioning: at the end of the original operating license, after some period of life extension, or sometime before the end of normal service. In this companion piece to his discussion of life extension in Chapter 20, James Hewlett addresses the third option. Premature decommissioning can arise--as it did for Unit 2 of Three Mile Island--from an accident, or--more commonly-because it may be cheaper to close the facility than to have it continue in operation. The economic implication of premature closure is one of potentially insufficient fund accumulation. As Hewlett points out, the decision to close a plant is complicated by decommissioning considerations; for example, the decision could depend in part on the status of the accumulated funds. Such a decision also can influence plans for new construction since it may delay the time of closure for existing plants. State regulatory bodies in the United States influence such decisions through their control over rates of return. In the end, decommissioning cost considerations often influence decommissioning timing.





Begin New Search
Proceed to Checkout

 

© 2025 International Association for Energy Economics | Privacy Policy | Return Policy