Chapter 8 - Applying Construction Lessons to Decommissioning Estimates

Robin Cantor

Year: 1991
Volume: Volume 12
Number: Special Issue
DOI: 10.5547/ISSN0195-6574-EJ-Vol12-NoSI-8
View Abstract

Abstract:
One of the standard practices in estimating costs for new procedures is to apply past experience. In this chapter, Robin Cantor uses prudency hearings and other data from power plant construction to illuminate some of the pitfalls likely to be encountered in preparing estimates for power plant decommissioning. Two of the most tempting pitfalls are scale and learning economies. She suggests that these presumed economies have had less impact on keeping construction costs down than expected, and that they also are unlikely to have much effect on decommissioning costs. Ignoring such evidence, she suggests, could result in decommissioning cost estimates that are too low and collection strategies that are inadequate. This finding has implications for future generations and future decommissioning options.





Begin New Search
Proceed to Checkout

 

© 2025 International Association for Energy Economics | Privacy Policy | Return Policy