While the International Association for Energy Economics (IAEE) makes every effort to ensure the veracity of the material and the accuracy of the data therein, IAEE is not responsible for the citing of this content until the article is actually printed in a final version of The Energy Journal. For example, preprinted articles are often moved from issue to issue affecting page numbers, and actual volume and issue numbers. Care should be given when citing Energy Journal preprint articles.

Decentralised Cross-Border Interconnection

Abstract:
Reaping the full benefits from cross-border interconnection typically requires reinforcement of national networks. When the relevant parts of the networks are complements, a lack of coordination between national transmission system operators results in investment below optimal levels in both interconnectors and national infrastructure. A subsidy to financially sustain interconnector building is not sufficient to restore optimality; indeed, even when possible, such subsidisation may have to be restrained so as not to encourage cross-border capacities that will not be fully utilised due to lack of investment in national systems.

Download Executive Summary Purchase ( $25 )

Keywords: Electrical grid, Interconnector, Externality, Regulation, Regional cooperation

DOI: 10.5547/01956574.44.4.ccra

References: Reference information is available for this article. Join IAEE, log in, or purchase the article to view reference data.

Published in Volume 44, Number 4 of the bi-monthly journal of the IAEE's Energy Economics Education Foundation.

 

© 2023 International Association for Energy Economics | Privacy Policy | Return Policy