Cited By
2013SSRN Electronic JournalVertical Integration as Firm-Level Response to Electricity Shortages: Does Transaction Cost Economics Explain?Ranjan Kumar Ghosh, Vinish Kathuriahttp://dx.doi.org/10.2139/ssrn.2295576
1994IEEE Transactions on Power Systems: Vol. 9, Issue 4Utility-cogenerator game for pricing power sales and wheeling feesA. Kuwahata, H. Asanohttp://dx.doi.org/10.1109/59.331444
1994Electrical Engineering in Japan: Vol. 114, Issue 6Game‐theoretic analysis of a buy‐back system and a cogenerator‐customer wheeling systemHiroshi Asano, Akeo Kuwahatahttp://dx.doi.org/10.1002/eej.4391140603
1991The Energy Journal: Vol. 12, Issue 2Economics of Electricity Self-Generation by Industrial FirmsKenneth Rose, John F. McDonaldhttp://dx.doi.org/10.5547/ISSN0195-6574-EJ-Vol12-No2-4

 

© 2024 International Association for Energy Economics | Privacy Policy | Return Policy